Idea projektu
The concept that I adopted in the design of the terminal building, the wing form, which is the most important organ required to perform the flight action, has been abstracted.
Popis projektu
While designing my space cage top cover, I modeled it to make my form clear and to benefit from natural lighting by letting the natural light beams into the terminal building at a horizontal angle. At the same time, I designed curves in the apron part of the terminal building in order to be able to perceive the wing form in appearances. In front of him, I developed a car park top cover model that would almost complete the design and create a whole with its surroundings. Using the occupancy-space design principle, I created a contrast with the terminal building.
Technické informace
Within the scope of the project, Van Airport New Terminal Building, which has a closed area of 65,000 m2, has a capacity of 4,000 passengers per hour. There are 8 passenger bridge boarding gates, 5 of which are for domestic lines and 3 for international lines, in the terminal building of 65,000 m2. The 3.5-floor terminal building has 1 basement, 1 outgoing floor, 1 incoming floor, and 0.5 mezzanine floor.